Home / Projects / Pump Stations / WRA Ankeny Pump Station Improvements

WRA Ankeny Pump Station Improvements

Ankeny, IA

The Des Moines Wastewater Reclamation Authority (WRA) took over operation of the City of Ankeny’s wastewater treatment facilities to provide a connection point to the WRA’s interceptor system and provide equalization and pumping for peak, wet-weather conditions. The WRA hired HR Green to provide a condition assessment of the facilities and recommend improvements to provide maintenance and rehabilitation, replace components that have exceeded the useful life, integrate the operational and control system into the WRA’s SCADA system, and bring the facilities up to current Code requirements.

HR Green provided design, bidding and construction-phase services to replace the climbing bar screen at the headworks, refurbish the existing pumps and motors, modify and replace portions of the piping system, and update the HVAC and building egress to conform to the most recent Code revisions. The project was completed in January of 2018.

Print

Let's stay in touch!

Select one or more markets below to receive HR Green market specific news.

Construction
Energy
Environmental
Governmental Services
Land Development
Transportation
Water