L27 Lift Station Provides Reliable Wastewater Service

The L27 Lift Station replaced an existing, aging facility in Hopkins, Minnesota, which was over 40 years old, had significant condition issues, and lacked redundancy. In addition, the existing lift station was undersized with little storage.

March 8, 2021
Trout Brook Nature Sanctuary and Trail

The Trout Brook Nature Sanctuary and Regional Trail, which was developed on a 42-acre urban brownfield site in Saint Paul. The project’s key design feature was the re-creation of approximately 3,000 feet of the Trout Brook after decades of confinement within an underground storm tunnel (the Trout Brook Interceptor).

November 9, 2020
Environmental Impacts Minimized for New Lift Station (10 MGD)

HR Green provided preliminary design, final design, and certain construction phase services for the demolition of the former plant, construction of a new facility; construction of a new lift station; and a new gravity interceptor while minimizing environmental impacts.

November 3, 2020
Houston Upper Braes Lift Station Rehabilitation (70 MGD)

The lift station located at the City’s Upper Braes WWTP had not undergone improvements for over 30 years and was starting to experience structural and mechanical piping corrosion issues. To avoid costly replacement, the City looked to HR Green to identify improvements that could prevent future failures and extend the life of the system. In

March 1, 2019
APWA Illinois Honors HR Green with Three Public Works Engineering Awards

HR Green, Inc. (HR Green) was presented with three public works engineering awards by the American Public Works Association (APWA) Illinois at a recent luncheon on Monday, February 25, 2019. HR Green received two awards for “Project of the Year” and one for “Management Innovation.”  The Project of the Year Award for structures of less than

December 19, 2018
Collection System Improvements

In the spring of 2015, portions of the City of Liberty flooded, revealing extensive problems with infiltration and inflow in the City’s collection system. The City had struggled to address needs and develop plans for the maintenance of their sanitary sewer collection system, and they sought a cost-effective way to identify problem locations and help in planning future operations and maintenance work.

May 20, 2017
Sanitary Lift Stations, Storm Pump Stations, and SCADA System Upgrades

Over the past 8 years, HR Green has worked with the City of Minneapolis on rehabilitation and standardization of 9 sanitary lift stations and 23 stormwater pump stations. The rehabilitation and standardization process started with separate engineering studies of the existing sanitary lift stations and existing stormwater pump stations. The studies focused on establishing reliability

April 4, 2016
HR Green Chosen to Implement Nevada, Iowa Capital Improvement Plan

HR Green has been chosen by the City of Nevada, Iowa to complete the planning, design, and bidding of four projects in its 2017 Capital Improvements Plan (CIP). The projects include street reconstruction, which also includes water main, sanitary sewer, and storm sewer reconstruction improvements; an asphalt resurfacing over cracked and seated PCC pavement project; a lift station study and design project; and the installation of storm collector lines at various locations in the City.

September 15, 2015
HR Green Picked by Liberty, Texas for Wastewater Collection System Evaluation

Liberty, Texas has picked HR Green to undertake a wastewater collection system evaluation resulting in a preliminary engineering report (PER). The collection system in Liberty was inundated this past Spring (2015) due to frequent intense rainfall and subsequent flooding of the Trinity River.

Let's stay in touch!

Select one or more markets below to receive HR Green market specific news.

Construction
Energy
Environmental
Governmental Services
Land Development
Transportation
Water