Home / Projects / Potable / Menlo Elevated Water Tower Refurbishing

Menlo Elevated Water Tower Refurbishing

Menlo Elevated Water Tower Refurbishing - Sioux Falls, SD

HR Green provided design and construction observation services for the recoating of the 1.5 million gallon spheroid water tower at Menlo Park. The 16-year old tower was in need of complete surface preparation and recoating of the exterior and interior wet/dry surfaces. The tower is in the central pressure zone and could not be taken out of service without first implementing two separate capital projects to assist with operation.

HR Green helped the operations team implement one of the projects with the Flow Control Valve Vaults, which regulate the flow from the high pressure zone to the central pressure zone. The construction process required full containment of the tower during sand blasting and coating to protect the surrounding neighborhood, park, and hospital parking lots. The tower exterior was coated with a high performance fluoropolymer coating, and the interior wet was coated with a high solids, high mil build, epoxy coating to provide a long-lasting coating system.

Print

Let's stay in touch!

Select one or more markets below to receive HR Green market specific news.

Construction
Energy
Environmental
Governmental Services
Land Development
Transportation
Water