Home / Projects / Commercial & Industrial / Village Green

Village Green

Village Green-Schaumburg, IL

 

HR Green was retained to perform a site feasibility study on two existing detention basins located in a retail development in Schaumburg. The objective was to investigate the practicability of converting either of the basins into developable real estate. HR Green coordinated with the Village of Schaumburg and analyzed existing engineering plans and storm water calculations to determine the anticipated storm water needs and potential sizing and location of an underground detention system.

Upon determining that it was possible to convert one of the basins to a retail site, HR Green was contracted to prepare engineering and landscape design documents for the construction of a Trader Joe’s storefront. Staff responsibilities included construction drawing and cost estimate preparation, meeting attendance, coordination with permitting and municipal agencies, assisting the client with obtaining permits and approvals, dry utility coordination and scheduling, coordination with a geo-tech and underground detention system designer, contractor correspondence, shop drawing review and construction administration. HR Green staff’s knowledge and experience in implementing underground detention systems was integral to the approval and overall success of this project. Overall, the project consisted of displacing a 2.0-acre feet detention pond and constructing a 12,705 square foot building and 100 stall parking lot in the heart of the Schaumburg retail corridor.

Print

Let's stay in touch!

Select one or more markets below to receive HR Green market specific news.

Construction
Energy
Environmental
Governmental Services
Land Development
Transportation
Water