Home / News / Indian Trail Bridge Ribbon Cutting

Indian Trail Bridge Ribbon Cutting

Hr Green, Inc.

Aurora, Illinois representatives officially opened the bridges carrying Indian Trail Road across the Fox River.

HR Green provided design engineering to widen the two existing bridges carrying Indian Trail Road over the east and west branches of the Fox River. Scope consists of deck replacement with in-kind substructure widening.

The existing east bridge was a three-span concrete deck on steel plate girder and wide flange beam bridge supported on concrete solid wall and hammerhead piers with spread footings or piles. The existing west bridge was a seven-span concrete deck on steel plate girder and wide flange beam bridge supported on concrete solid wall and hammerhead piers with spread footings.

The project consisted of the concrete deck removal, replacement and the widening of the two bridges carrying Indian Trail Road over the Fox River and pavement reconstruction between IL Route 31 (Lake Street) and IL Route 25 (Aurora Avenue).  The improvements also include new curb and gutter, 7′ wide sidewalks on both sides of the bridges, decorative railings with historic plaques, LED street lighting with decorative poles, improved drainage, guardrail, pavement markings and landscaping.

To see photos of the project visit HR Green’s Facebook Page

Print

Let's stay in touch!

Select one or more markets below to receive HR Green market specific news.

Construction
Energy
Environmental
Governmental Services
Land Development
Transportation
Water